Главная > > Russian ore maker sets into operation Novy-2 patch at Burluksky ore deposit of Krasnoyarsk Region
Russian ore maker sets into operation Novy-2 patch at Burluksky ore deposit of Krasnoyarsk Region09.08.2006. Разместил: public |
Irbinsky branch of Evrazruda JSC (part of Evraz Group) started developing Novy-2 patch in view of the forthcoming depletion of Novy-1 patch. The patches are located within .5 km away of each other. Together, they form the so-called Small Open Pits of Burluksky ore deposit.
By the November 2006, the reserves of Novy-1 patch will have been extracted completely. By then, the company is to build trenches, a road to the pit, and a lip trench, carry the equipment from Novy-1 over to Novy-2 and construct a 6-kilovolt power line to supply the outfit with electricity. This was reported by Evrazruda PR-department. Вернуться назад |